Jekath Fibertronics
Field guide

Before the First Splice: Set Up Your Fibre Workstation

Jekath Fibertronics

A field checklist for arranging fibre preparation, clean work, splice protection and controlled waste before fusion splicing.

Explore this guide

Check the site before unpacking

Confirm that the work area is authorised, stable, well lit and suitable for the equipment. Resolve electrical, traffic, weather and access hazards through your approved site procedures. Follow local rules, the equipment manuals and the controls required for the job.

Arrange the bench in working order

Set up distinct areas for cable preparation, clean fibre work, splice protection and waste. Keep incoming cable and used tools away from the clean area. Route power leads away from the path used to move fibre and leave room to handle enclosures and trays.

Confirm tool compatibility

Check the fibre type and sizes against your stripper, cleaver, holders and splicer instructions. Prepare the specified sleeves and approved cleaning materials before starting. If a tool performs inconsistently, consult the manufacturer’s maintenance guidance and replace only compatible parts.

Control scraps and hand over a clean area

Use the prescribed closed container for fibre fragments. Follow the site and instrument instructions for eye protection and for verifying optical sources before inspection. At handover, put tools away, remove debris by the approved process and document unfinished work.

Need help choosing or servicing equipment?

Explore equipment services →